Gas Processing

Under this heading the areas of ENAR's expertise include:

  • Wellhead flow lines
  • Gas oil separation facilities
  • Gas oil processing including sour gas treatment
  • LPG recovery and condensate stabilization
  • MEA/MDEA
  • Specialty solvents and membrane
  • Wellhead compression facilities
  • Offsite and utilities i.e. produce water treatment, flaring gas lifts and gas injection
  • Storage and loading
In the above areas the range of services include:

  • Technology/Process Evaluations
  • Conceptual design & FEED document
  • Detailed engineering:
    • Process
    • Mechanical
    • Civil
    • Electrical
    • Instrumentation
  • Project management and construction supervision
  • Start-up and commissioning
  • Troubleshooting
ENAR's involvement in gas processing dates back to early 1980s. Currently, ENAR is intensively involved in design engineering and execution of gas processing facilities.

Some of the major gas processing projects in which ENAR has been involved include:

  • Design, engineering, procurement assistance and construction supervision services (EPC) for OGDCL Dakhni Gas Processing Project in operation for over one and half decade.
  • EPC services for Kunnar LPG Recovery Project - operating since September 2000.
  • EPC services for Bobi LPG Recovery Project - engineering work completed and construction to start shortly.
  • Basic detailed engineering of Gas Gathering Network and processing facilities of Tando Alam Facility.
  • Construction supervision services for Pirkoh Gas Compression Project - in commercial operation.
  • Consultancy services including tender document bid evaluation and design review for dehydration plants at Pirkoh Field.
  • Construction supervision for 300 MMSCFD Uch Gas Processing Facility including 11 MW power station and other utilities designed by ENAR and a very large (60 million gallons) water storage and delivery system.
  • Construction supervision services Qadirpur Gas Processing Complex (Phase - I)
ENAR has recently completed the Qadirpur Capacity Enhancement Project. The work undertaken included, carrying out process design, detailed engineering, project/ construction management, procurement support (600 MMSCFD Mega Membrane Facility). Prior to this assignment ENAR carried out an in-depth evaluation of UOP's Proposal for enhancement of Qadirpur Gas Processing Capacity. Apart from this project ENAR has also prepared FEED Document for MOL's Gurguri Gas Plant, PEL's Badar & Kandra Gas Processing Facilities and PPL's Adhi LPG/NGP Plant II including detailed engineering of package equipment.

ENAR has also carried out design engineering work of following Gas Processing Projects:

  • Basic and detailed design of Tangri Mazari: Amine Plant Upgrade Facility - BP Pakistan Limited (Formerly UTP)
  • FEED Document for Mazarani Gas Processing Facility - Pakistan Petroleum Limited (PPL).
  • Engineering Verification of Miano - Kadanwari Upgrade Project for OMV Pakistan Limited