Contact| Email| Sitemap| Home

HAZOP / Risk Analysis

ENAR uses its experience and competence to provide risk assessment, reliability and safety analysis as well as financial risk valuation in the hydrocarbon, petrochemical, chemical and fertilizer industries.

ENAR provides recommendations on the technical and organizational issues which allow the reduction of risks to an acceptable level.

  • Safety Studies
  • Safety Audits
  • HAZOP Studies
  • Analysis of accidents and related damages
  • Emergency Plans:
    • Internal and External Operation Plan
    • Surveillance and Action Plan (Pipeline)
  • Estimated Maximum Loss (or reasonably expected)
  • Regulation Studies
Risk studies involve a multi-disciplinary team associating varied competence and experience available at ENAR and its partners and associates.

On every major project that ENAR undertakes as a design assignment, a HAZOP and screening study is undertaken. A dedicated team of engineers knowledgeable in the field is constituted for every job and a detailed study is undertaken. The recommendations of these studies than form part of the design and development of operating procedures.

Major HAZOPs carried out by ENAR are given below:

  • HAZOP for OGDCL Dakhni Development Project with Pritchard
  • HAZOP for PA Themral Section with Lurgi of Germany
  • Review of HAZOP for Uch Pipeline Project for OGDCL
  • Review of HAZOP for Tangri Project for BP
  • HAZOP Study for PPL Mazarani Project
  • HAZOP study for PPL Adhi LPG/NGL Expansion Project
  • HAZOP study for OGDCL Qadirpur Capacity Enhancement Project
  • HAZOP for expansion of BP's Golarchi and Bukhari Compression Project
  • HAZOP study for Eni Pakistan Flow line and Compressor Project
  • HAZOP of 3000 BPSD Petroleum Refining Facility